The JSOC server room was significantly affected by flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice.
Observation Details
XRT: AR Obs 1
2024-08-27T13:36:58 to 2024-08-27T15:21:17
Science Goal:
Program: XOB:1C8E; AR (Filter-Ratio with Al/poly and thin-Be long/short pairs) with PFB, 512x512 at 1064 1048, thick-Al context, with G-band (1ms/1ms leak), 180s cad (1C91)