Heliophysics Events Knowledgebase Coverage Registry (HCR)
Observation Details
Overview Where Groups: Mode, FOV, # spectra in map Data Links
2007-01-09 16:13:35-19:07:18
N polar observations
CORE: Polar Region Observation Campaign
x,y:-5",952"
Max FOV:324"x162"
Target:N Pole
Nearby Events
6302A Continuum Intensity324"x162"2047 spectra
6302A Longitudinal Flux Density324"x162"2047 spectra
6302A Transverse Flux Density324"x162"2047 spectra
6302A Velocity 6301.5A324"x162"2047 spectra

Level 1 Summary
Level 2 Summary
Level 1 Monthly
Level 2 Monthly
SOTSP: N polar observations
2007-01-09T16:13:35 to 2007-01-09T19:07:18
Science Goal: CORE: Polar Region Observation Campaign
Program: Normal map Full FOV
Target: N Pole
xcen=-5 ycen=952
Instrument: SOTSP
HOP/JOP: 2
Description: Observations are done in Gband, CaH, 6302 mags, some slot FOV. Few limb observations had been done up to this point in the mission. Plus SP maps. Joint XRT, EIS, SOT, SOHO polar observations are requested, beginning on Tuesday, 2007/01/09. XRT proposes polar observations for six hours each day of the week, between usual synoptics at 16:00UT and 22:00UT. Request to SOT HOP Number 0002 G-band and Ca-H at high cadence full resolution with vector magnetograms. ??????4.8 x 4 seconds integration time needed in SP to increase the SNR a factor of 2 on the limb Time evolution of granular structures are ~ 1 min. 80"x120" maps will take 4 hours in total 5 positions (North, South, East, West, disc center) with no active regions. West limb have been only once observed and East limb never !!! At least high resolution G-band maps (1x1) to identify magnetic features.

Observations are done in Gband, CaH, 6302 mags, some slot FOV. Few limb observations had been done up to this point in the mission. Plus SP maps. Joint XRT, EIS, SOT, SOHO polar observations are requested, beginning on Tuesday, 2007/01/09. XRT proposes polar observations for six hours each day of the week, between usual synoptics at 16:00UT and 22:00UT. Request to SOT HOP Number 0002 G-band and Ca-H at high cadence full resolution with vector magnetograms. ??????4.8 x 4 seconds integration time needed in SP to increase the SNR a factor of 2 on the limb Time evolution of granular structures are ~ 1 min. 80"x120" maps will take 4 hours in total 5 positions (North, South, East, West, disc center) with no active regions. West limb have been only once observed and East limb never !!! At least high resolution G-band maps (1x1) to identify magnetic features.

Annotations:
Hits: 78
Chief Observer
Tarbell
Related Links
Cites: N polar observations     
Timeline: gif use
See also
Datasets
Get All Data
saaIntervals hiIntervals

wavelength: 6302A Continuum Intensity cadence: -1 min fov: 324,162 images: 2047 JavaScript Landing Page
wavelength: 6302A Velocity 6301.5A cadence: -1 min fov: 324,162 images: 2047 JavaScript Landing Page
wavelength: 6302A Transverse Flux Density cadence: -1 min fov: 324,162 images: 2047 JavaScript Landing Page
wavelength: 6302A Longitudinal Flux Density cadence: -1 min fov: 324,162 images: 2047 JavaScript Landing Page