The JSOC server room was significantly affected by
flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice.
Observation Details
IRIS: A1: QS monitoring
2023-05-07T04:30:04 to 2023-05-07T04:48:08
Program: OBS 3882010194: Large coarse 64-step raster 126x120 64s C II Si IV Mg II h/k Mg II w s Deep x 15 SJI cadence 0.5x faster
Target: QS
xcen=16 ycen=64
Instrument: IRIS
Description:
A1: QS monitoring
1 repeats of OBSID 3882010194 - Large coarse 64-step raster 126x120 64s C II Si IV Mg II h/k Mg II w s Deep x 15 SJI cadence 0.5x faster
IRIS roll: 0.0 degrees
IRIS planner pointing: (16.0 arcsec, 64.0 arcsec)
OBS duration: 1084.4 seconds = 1 repeats x 1084.4 seconds/repeat
OBS data volume: 162.7 megabytes = 1301.3 megabits = 1084.4 seconds * 1.2 megabits/second
Hits: 62
Planner: William Ashfield