The JSOC server room was significantly affected by
flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice.
Observation Details
IRIS: EVE sounding rocket coordination (flare ribbon study AR 13293)
2023-05-03T18:11:30 to 2023-05-03T20:24:53
Program: OBS 3684107103: Large sit-and-stare 0.3x120 1s C II Si IV Mg II h/k Deep x 4 Spatial x 2, Spectral x 2 SJI cadence 10x faster
Target: AR
xcen=-582 ycen=260
Instrument: IRIS
Description:
EVE sounding rocket coordination (flare ribbon study AR 13293)
500 repeats of OBSID 3684107103 - Large sit-and-stare 0.3x120 1s C II Si IV Mg II h/k Deep x 4 Spatial x 2, Spectral x 2 SJI cadence 10x faster
IRIS roll: 0.0 degrees
IRIS planner pointing: (-582.0 arcsec, 260.0 arcsec)
OBS duration: 8003.0 seconds = 500 repeats x 16.0 seconds/repeat
OBS data volume: 1010.4 megabytes = 8083.0 megabits = 8003.0 seconds * 1.0 megabits/second
Hits: 39
Planner: William Ashfield