Heliophysics Events Knowledgebase Coverage Registry (HCR)
The JSOC server room was significantly affected by flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice. IRIS now has data since Dec. 21.
Observation Details
IRIS: B1: AR tracking limb-to-limb
2016-03-20T05:29:28 to 2016-03-20T05:47:33
Program: OBS 3693010061: Large coarse 64-step raster 126x120 64s Deep x 15 SJI cadence 3x faster Lossless compression
Target: AR
xcen=-540 ycen=342
Instrument: IRIS
Description: B1: AR tracking limb-to-limb
1 repeats of OBSID 3693010061 - Large coarse 64-step raster 126x120 64s Deep x 15 SJI cadence 3x faster Lossless compression
IRIS roll: 0.0 degrees
IRIS planner pointing: (-540.0 arcsec, 342.0 arcsec)
OBS duration: 1085.4 seconds = 1 repeats x 1085.4 seconds/repeat
OBS data volume: 257.8 megabytes = 2062.3 megabits = 1085.4 seconds * 1.9 megabits/second

Projected Pointings:
1600304HMI Continuum171HMI Blos19394
Hits: 219
Planner: Ryan

Cited By: Get Data
Timeline: GIF TIM