The JSOC server room was significantly affected by
flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice. IRIS now has data since Dec. 21.
Observation Details
IRIS: Context of AR 12280 (left)
2015-02-11T08:43:21 to 2015-02-11T08:53:23
Program: OBS 3820258093: Very large sparse 64-step raster 63x175 64s Deep x 8 FUV spectrally rebinned x 2
Target: AR
xcen=768 ycen=-69
Instrument: IRIS
Description:
Context of AR 12280 (left)
1 repeats of OBSID 3820258093 - Very large sparse 64-step raster 63x175 64s Deep x 8 FUV spectrally rebinned x 2
IRIS roll: 0.0 degrees
IRIS planner pointing: (768.0 arcsec, -69.0 arcsec)
OBS duration: 602.9 seconds = 1 repeats x 602.9 seconds/repeat
OBS data volume: 105.5 megabytes = 844.1 megabits = 602.9 seconds * 1.4 megabits/second
Hits: 182
Planner: Takenori Okamoto