Heliophysics Events Knowledgebase Coverage Registry (HCR)
The JSOC server room was significantly affected by flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice. IRIS now has data since Dec. 21.
Observation Details
IRIS: DST flare watch coordination
2014-10-23T14:56:35 to 2014-10-23T17:46:16
Program: OBS 3860354980: Large coarse 8-step raster 14x120 8s C II Mg II h/k Mg II w Deep x 2 Spatial x 2, Spectral x 2 FUV spectrally rebinned x 2
Target: AR
xcen=-8 ycen=-315
Instrument: IRIS
Description: DST flare watch coordination
400 repeats of OBSID 3860354980 - Large coarse 8-step raster 14x120 8s C II Mg II h/k Mg II w Deep x 2 Spatial x 2, Spectral x 2 FUV spectrally rebinned x 2
IRIS roll: 90.0 degrees
IRIS planner pointing: (-8.0 arcsec, -315.0 arcsec)
OBS duration: 10181.6 seconds = 400 repeats x 25.5 seconds/repeat
OBS data volume: 954.5 megabytes = 7636.2 megabits = 10181.6 seconds * 0.8 megabits/second

Projected Pointings:
1600304HMI Continuum17119394
Hits: 293
Planner: SAO Planner

Cited By: Get Data
Timeline: GIF TIM