Heliophysics Events Knowledgebase Coverage Registry (HCR)
The JSOC server room was significantly affected by flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice. IRIS now has data since Dec. 21.
Observation Details
IRIS: GT calibration
2014-08-21T06:04:06 to 2014-08-21T06:29:06
Program: OBS 3800: 4 limb coalignment sequence
Target: AR
xcen=698 ycen=188
Instrument: IRIS
Description: GT calibration
250 repeats of OBSID 3800 - 4 limb coalignment sequence
IRIS roll: 0.0 degrees
IRIS planner pointing: (698.0 arcsec, 188.0 arcsec)
OBS duration: 1500.0 seconds = 250 repeats x 6.0 seconds/repeat
OBS data volume: 281.2 megabytes = 2250.0 megabits = 1500.0 seconds * 1.5 megabits/second

Projected Pointings:
1600304HMI Continuum17119394
Hits: 230
Planner: Paola Testa

Cited By: Get Data
Timeline: GIF TIM