Heliophysics Events Knowledgebase Coverage Registry (HCR)
The JSOC server room was significantly affected by flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice.
Observation Details
IRIS: Priming for GT-ISS Obs
2014-01-31T06:16:00 to 2014-01-31T06:16:12
Program: OBS 3800: 4 limb coalignment sequence
Target: AR
xcen=-554 ycen=234
Instrument: IRIS
Description: Priming for GT-ISS Obs
2 repeats of OBSID 3800 - 4 limb coalignment sequence
IRIS roll: 0.0 degrees
IRIS planner pointing: (-554.0 arcsec, 234.0 arcsec)
OBS duration: 12.0 seconds = 2 repeats x 6.0 seconds/repeat
OBS data volume: 2.2 megabytes = 18.0 megabits = 12.0 seconds * 1.5 megabits/second

Hits: 183
Planner: Sarah Jaeggli

Cited By: Get Data
Timeline: GIF TIM