Heliophysics Events Knowledgebase Coverage Registry (HCR)
The JSOC server room was significantly affected by flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice.
Observation Details
IRIS: GT ISS cal
2014-01-11T18:41:09 to 2014-01-11T18:41:21
Program: OBS 3800: 4 limb coalignment sequence
Target: (NONE)
xcen=675 ycen=-117
Instrument: IRIS
Description: GT ISS cal
2 repeats of OBSID 3800 - 4 limb coalignment sequence
IRIS roll: 0.0 degrees
IRIS planner pointing: (675.0 arcsec, -117.0 arcsec)
OBS duration: 12.0 seconds = 2 repeats x 6.0 seconds/repeat
OBS data volume: 2.2 megabytes = 18.0 megabits = 12.0 seconds * 1.5 megabits/second

Hits: 227
Planner: Paul Boerner

Cited By: Get Data
Timeline: GIF TIM